- phone-alt 859-238-1233
At just over 10,000 square feet of skateable terrain, the Millennium Park Skatepark – opened in September of 2026 – was designed and built by Spohn Ranch Skateparks.
Local stakeholders wanted a park that offered a solid mix of street and transition terrain, which ultimately led to a layout that’s roughly 60% street and 40% transition.
The finished park has a natural flow, with plenty of options to get creative no matter what you ride. Elevation changes throughout the site help riders carry speed and move smoothly from one section to the next, while the layout provides multiple lines and enough separation for several riders to use the park at the same time.
Standout features include a 6-foot-deep bowl, multiple rails and ledges, a four-stair, a double-sided slappy curb, hips of varying sizes, a bank-to-ledge, and a large transition feature at the lower end of the park that helps riders build speed and work their way back uphill.




